Skip to content
New Build Painting project completed in Melbourne

New Build Painting Melbourne

Quality painting for new constructions and developments.

WHAT YOU GET

What's Included

Full interior painting — walls, ceilings, doors and trim
Exterior coating application
Dulux premium paint systems throughout
Colour coordination with builder and owner selections
Stage-by-stage scheduling to suit build program
Defect-free handover and final inspection

Our Approach

Builder Coordination

We work closely with your builder to schedule painting stages around the construction program, minimising delays and rework.

New Plaster Preparation

Fresh plaster and plasterboard require specific preparation. We seal, prime and apply the correct number of coats for full coverage and durability.

Quality System

We follow a systematic approach to new builds — room by room, coat by coat — with documented progress and quality checks at each stage.

New Build Painting — Getting It Right From the First Coat

Painting a newly constructed home is different from repainting an existing property. New plasterboard has never been sealed or coated, which means it absorbs paint unevenly unless properly primed first. The standard process for new plasterboard is one coat of dedicated plasterboard sealer — such as Dulux Prepcoat Sealer Undercoat — followed by two full topcoats. Skipping the sealer or using a cheap product results in flashing — visible differences in sheen and colour between the plasterboard joints and the face of the sheets.

We work with builders and owner-builders across Melbourne to deliver new build painting that meets or exceeds the expected standard of finish. Our team schedules painting in stages to align with the construction program — typically priming and first coat after plastering, then final coats after all joinery and fixtures are installed. This staged approach prevents damage to finished paintwork from other trades and ensures the final result is defect-free at handover.

Frequently Asked Questions

How many coats do new walls need?
New plasterboard typically requires one coat of sealer/primer and two topcoats for full coverage and a consistent finish. Some dark colours may require an additional coat.
Can I choose my own colours for a new build?
Absolutely. We can work with your builder selections or help you choose a custom palette through our colour advice service.
Do you handle multi-unit developments?
Yes. We have the team capacity to handle multi-unit residential developments and can scale our crew to meet project timelines.

READY TO START?

Request a Free Quote

Request a Free Quote

Tell us about your project and we'll call you back within 2 hours.

Quality Workmanship Guarantee

We stand behind every job

5-Year Interior Warranty

Our interior paintwork is guaranteed not to peel, blister, or crack for 5 years from completion.

3-Year Exterior Warranty

Exterior surfaces are covered for defects in preparation and application for 3 years.

$20M Public Liability

Fully insured with $20 million public liability coverage for your complete peace of mind.

Australian Consumer Law

Our guarantee is in addition to your statutory rights under Australian Consumer Law.

We'll return and fix any workmanship issue within the warranty period at no cost.

Call Now Get Quote